Moss Water Treatment Plant

The Moss Water Treatment Plant is located on the northeast side of the City of Hopkinsville, on Metcalfe Lane and is named after the previous General Manager of HWEA, McKenzie Moss. Construction of the plant began in 1995 and the plant went online producing water in May 1997. Currently the plant has a design capacity of 10 million gallons per day. The treatment plant serves drinking water to Hopkinsville, Pembroke, Crofton and the Christian County Water District. The plant processes raw water from Lake Barkley in a 27 mile pipeline to Hopkinsville. HWEA also maintains a separate raw water supply at it's North Quarry.  The Lake Barkley raw water intake and pipeline has a capacity of 20 MGD, projected to meet the needs of Hopkinsville - Christian County over the next 50 years. 

Since the Moss WTP is at 80% capacity, plans are being designed to expand the treatment plant to 15 MGD. Bids in the $12 million expansion are expected to be opened in the Fall of 2008, and the construction to be completed by early 2010.
Listed below are the stages of treatment:

1. Coagulation: Raw water treated with aluminum sulphate, carbon, potassium permanganate, and chlorine flows through a static mixer vault so that larger solids can form for the settling process.

2. Clarification: Treated water passes through while the sludge blanket and solids begin to settle out.

3. Filtration: Remaining solids are filtered out using 8 dual media filters (anthracite and sand).

4. Disinfection: Filtered water is chlorinated and fluoridated before leaving the plant.

5. Corrosion control: Treated water is dosed with caustic soda and polyphosphate to reduce corrosivity.

Water quality monitoring is an important part of the treatment process. Parameters such as pH, turbidity, and free and total chlorine are checked through the plant every 4 hours. Hardness, alkalinity, iron, manganese, and fluoride levels are checked daily on the raw and finished water. Bacteriological monitoring, which consists of 50 samples a month taken on the distribution system as well as numerous process control samples, is performed on-site in our state certified bacteriological laboratory. An independent commercial laboratory is contracted to perform all other compliance monitoring as required by the Safe Drinking Water Act. Parameters included in this monitoring cover everything from metals to pesticides. The Moss WTP has received 2 awards since the beginning of operations. They are the1997 Award of Excellence for Plant Operations-American Water Works Association, KY-TN Section and 1998 Outstanding Water Plant Operations-Kentucky Water and Wastewater Association. Moss WTP is staffed 24/7 by a team consisting of a chief operator, laboratory technician, 6 Kentucky Certified shift operators, and a laborer.


ADDRESS:  1000 Metcalfe Lane 
                   Hopkinsville, KY  42240


Please note that the Moss WTP is closed to the public.


DIRECTIONS: From downtown Hopkinsville, take U.S. Hwy 41 North to Metcalfe Lane, just past Riverside Cemetery. Turn right on Metcalfe Lane and proceed to the end of the road approximately 0.8 of a mile.


For directions to our location, enter your starting point in the form below and click the "Get Directions" button. A new window will open displaying a map with directions.

Get Directions To:
1000 Metcalfe Lane
Hopkinsville KY 42240
USA
Starting From:
Street Address
City
State
Postal Code
Country

ELEVATED WATER STORAGE TANKS & BOOSTER STATION

HWEA has seven water storage tanks throughout its system. These tanks store treated water for peak customer demands, fire protection, and pressure regulations. The tanks and their sizes are: 

Sanderson Drive Tank -          1,000,000 Gallons

Industrial Park Tank -             2,000,000 Gallons

Gainsville Hill Tank -              2,000,000 Gallons

Commerce Park Tank -          1,000,000 Gallons

WTP Clearwell -                       800,000 Gallons

Pembroke Tank -                       75,000 Gallons

Crofton Tank -                          100,000 Gallons

 

HWEA maintains a water system booster station at Commerce Park.



WATER MAINS & HYDRANTS


HWEA owns, operates, and maintains over 263 miles of water mains ranging in size from 2" to 16". The system has over 1,168 hydrants.